MacGregor TTS Acquisition Overview
Actions
Intelligent service solutions
are strongly connecting
MacGregor and top tier
Chinese shipowners
■
In China, pilot cases started with top tier ship
owners
Based on real customer pain-points
MacGregor On Watch Scout
See Tomorrow. Today
C
ONWATCH SCOUT|
<8
Fleet
Analytic - Saturn
Jonathan Smith
13/6/2019-29/6/2019
DOWNLOAD PDF
■
Applying machine learning algorithms
Cargotec cloud connectivity
■
Intuitive customer interface on and offshore
Monitoring with recommended actions to reduce
unplanned downtime and maximise availability
☐
CARGOTEC
19
L
☐
MODEL:428
LJ
GN
Equipment
System Events All (8)
Event count
Analytics
A
Notifications
801 CRA 1 (4)
1001 CRA 2 (2)
1001 CRA 3 (1)
1001 CRA 4 (1)
0
0
0
0
D
HPU
Tank
Pump
Slew
Tugger
Main winch AHC
Whip winch
Control
Electrical
Technical
documents
Status
Event Code Equipment
System
Event number Dates
自
Service reports
Critical
31 031
801 CRA 1
Control
Meaning/Consequences
Angle difference >3 between primary
and secondary angle-encoder on jib
Time vs Oil Pressure [Winches - Pumps -
Motors]
E
Oil pressure (bar)
Normal
interval
200
100
Crane 1
150 bar
D
16 Jun
21 Jun
26 Jun
1 Jul
6 Ju
11 Ju
Time
801 CRA 1
100 CRA 2
100t CRA 3
1001 CRA 4
Time vs Temperature [Control System]
Time (hrs)
200
100
-20-0
0-20
Normal
interval
110 hrs
6
16/6/19-19/6/19,
17/7/19,16/8/19, 17/9/19
Accumulated torque on slewing bearing
Accumulated torque is calculated from: (weight in hook)*(outreach)
x (time)
180
180
BOT CRA 1
12000
8000
180°
100T CRA 2
90°
12000
270°
270
100T CRA 3
100T C
TCRA 4
90
90°
8000
270
270°
8000
12000
Average Lift Load
20-40
40-60
Temperature (")
50-80
BOT CRA 1
100T CRA 2
100T CRA 3
100T CRA 4
0
DView entire presentation