Investor Presentaiton
Soto Norte overview
-
Previously known as La Bodega and El Gigante, Soto Norte is an advanced feasibility-stage
underground gold project undergoing permitting
Feasibility Study Highlights 1,2,3
5.0 Moz @ 6.22 g/t
Probable Mineral Reserves
Production (processing) & AISC schedule¹
1000
600
450 koz per year
Gold production
900
8.5 Moz @ 5.47 g/t
Indicated Mineral Resources
US$471/oz
AISC (LOM average)
3.6 Moz @ 4.06 g/t
Inferred Mineral Resources
14-year mine life
(Mining, Reserves only)
US$1.2 billion
Development capex³
Gold production (koz)
500
400
800
700
600
300
500
200
100
US$1.5 billion
Post-tax NPV4 (5%)
0
1 2 3 4 5 6 7 8 9 10
Statistics per N1I43-101 Feasibility Study. 100% basis.
Notes:
1.
2.
3.
4.
Assumes gold price of US$1,6575 per ounce
See Appendix for full disclosure of Mineral Reserve and Mineral Resource estimates. Indicated Resources inclusive of Reserves.
Includes contingency costs and pre-production operating costs
Production
AISC
0
400
300
200
100
ARIS GOLD
5