Massive Sulphide Project Overview slide image

Massive Sulphide Project Overview

7155000 MASSIVE SULPHIDE PROJECT SIMPLIFIED GEOLOGY OF MAIN ZONE 2018 Drilling results illustrated: High-grade Silver-Lead-Zinc averaging over 20% (Pb-Zn) and 100g/t Ag Significant true widths of over 9m ■ Remains open below 200m vertical depth 2019 drilling is focused at the Extension Target: ■ 2019 goal was to extend mineralization along strike from the heavy massive sulphides intersected in 2018 CANTEX TSXV: CD 7152500 7153000 7153500 7154000 7154500 562500 Legend Cantex Claims Boundary Waterbody Watercourse Drill Pads Geologic Legend Contacts Defined Contacts Projected Zone Defined Zone Projected Faults Dike Swarm Lithology Alteration Zone Inferred. Dolomitic Argilite Glacial Till Cover Layered Argilitic Dolomite Pyritic Siltstone 0 0.125 0.25 0.5 Km 562500 1:15,000 563000 EXTENSION TARGET 563000 563500 564000 564500 565000 6 3 075 MZ5X DISCOVERY TARGET 1. MZ10 M29 MZ8 MZ7 B MZ6 M74 MZ3 MZ2 AB' 563500 564000 564500 565000 9 2018 PADS 7152500 7153000 H 7153500 7154000 7154500 7155000
View entire presentation