Power (MW) Power (MW) REmap A Renewable Energy Roadmap IRENA International Renewable Energy Agency 400 Transmission system adequacy 300 200 100 0 -100 -200 Sur Profundo (node) South region 600 400 200 0 -200 -400 -600 0 20 40 60 Residual load duration curve Current transmission limit ** 80 100 Percent of hours of year (% sorted) ** Source: Transmission system restrictions study for 2016-2019, OC-SENI 2015 Transmission network analysis: Production of wind power and demand for power was calculated for each subzone Net load (power demand minus VRE generation) can be negative This means that there would be a need to export power from these, to other subzones Transmission system must be expanded so that Wind power can be transmitted to the bigger load centres Otherwise curtailments due to transmission congestions are likely Transmission system planning must be coordinated with VRE projects Strategies for financing the required network upgrades must be investigated 26