Investor Presentaiton
Power (MW)
Power (MW)
REmap
A Renewable Energy Roadmap
IRENA
International Renewable Energy Agency
400
Transmission system adequacy
300
200
100
0
-100
-200
Sur Profundo (node)
South region
600
400
200
0
-200
-400
-600
0
20
40
60
Residual load duration curve
Current transmission limit **
80
100
Percent of hours of year (% sorted)
** Source: Transmission system restrictions study for 2016-2019, OC-SENI 2015
Transmission network analysis:
Production of wind power and demand for
power was calculated for each subzone
Net load (power demand minus VRE
generation) can be negative
This means that there would be a need to
export power from these, to other
subzones
Transmission system must be expanded
so that Wind power can be transmitted to
the bigger load centres
Otherwise curtailments due to
transmission congestions are likely
Transmission system planning must be
coordinated with VRE projects
Strategies for financing the required
network upgrades must be investigated
26View entire presentation