Investor Presentaiton slide image

Investor Presentaiton

Appendices > Maxi-Group Development Plan Maxi-Group Development Plan Pursuing capacity growth and value enhancing opportunities Urals Central Russia Siberia Existing facilities (2007 capacity) Billets: 2.4 mt Re-bar: 1.32 m t Metal-ware: 0.55 m t Urals Scrap Division* 300 scrap yards: 3 m t scrap New facilities 2008-2011 Capex: USD 1.8 bn1 Seamless pipes: 0.45 m t Wire rods: 1.0 mt (2008) Long products: 0.9 m t Billets: +1.5 m t Center Scrap Division* New facilities 2012-2015 Capex: USD 2.0 bn¹ Channels: 0.5 m t Seamless pipes: +0.5 m t (TBC) Billets: +2.0 m t Long products: +0.8 m t Flat products: +1.9 m t (TBC) Siberia Scrap Division* Seamless pipes: 1.0 m t (TBC) 1. 2. 10 million t 10 8 10 7.8 2 8 5.9 2 2 6 4.5² 6 3.9 3.02 2.4 2 3.22 4 4 1.3 NO 2 2 2 0 0 Scrap Steel Long Scrap Steel Long Scrap Steel Long Maxi-Group investment program is currently under review and may therefore undergo material changes. Volumes does not include to-be-confirmed (TBC) projects. 32
View entire presentation