TAQA H1 2021 Results - Energy Transition and Financial Performance slide image

TAQA H1 2021 Results - Energy Transition and Financial Performance

TAQA at a glance (1) Our global footprint Canada Oil and gas assets TAQA-operated and non-operated 72,928 boepd (62%)* 16% crude / 70% gas/ 14% NGL 2P reserves: 263mn boe (82%)* UK / the Netherlands Oil and gas assets (off and onshore) TAQA-operated and non-operated 34,755 boepd (29%)* 85% crude / 14% gas/ 1% NGL 2P reserves: 29mn boe (9%)* Two gas storage facilities GSB (60% TAQA), PGI (40%); Gas storage capacity: 4.7 bcm (53.2 TWh) Morocco Jorf Lasfar coal-fired power plant TAQA-operated; 86% (units 1-4), 91% (units 5-6) 2,056 MW (9%)* Iraq Atrush block in Kurdistan Region of Iraq TAQA-operated; 10,283 boepd (9%)* 100% crude 2P reserves: 27mn boe (9%)* United Arab Emirates 12 gas-fired and renewable power and water plants Non-operated; 40-80% TAQA; 0-20% Other GRE; 40% Int'l Partners** 17,668 MW (82%)* / 913 MIGD (100%) 13 years weighted average P(W)PA residual life India Neyveli lignite-fired power plant TAQA-operated; 100% TAQA 250 MW (1%)* 12 years 23 years Power Power and Water Country Plant name United States Red Oak gas-fired power plant (New Jersey) Non-operated merchant asset; Operatorship; TAQA ownership Power/water (installed capacity^) P(W)PA residual life (as at 31/12/2020) Transmission and Distribution 85% TAQA 832 MW (4%)* 2 years (tolling agreement) Lakefield wind farm (Minnesota) Non-operated; 50% TAQA 206 MW (1%)* 11 years Ghana Takoradi gas-fired power plant TAQA-operated; 90% TAQA 330 MW (2%)* 20 years United Arab Emirates Transmission and distribution Operated; 100% TAQA 100,000 km power and water networks Oil and Gas Country Asset description Operatorship FY 2020 average production Hydrocarbon production mix (% crude/gas/NGL) 2P reserves (as at 31/12/2020) Oman Sohar Aluminium smelter Non-operated; 40% TAQA 1,000 MW *** / 375k tons aluminium per year Captive Saudi Arabia Jubail Energy gas-fired power and steam plant Non-operated; 25% TAQA 250 MW (1%)*/ 510 tons per hour of steam 4 years Note: 49% associate investment in Massar Solutions not shown Λ Installed gross power and water capacity at PCOD * ** Percentage of global TAQA capacity / production / 2P reserves of 21,592 MW, 913 MIGD / 118.Omboped / 320mmboe Int'l partners include: Engie, Marubeni, JGC, JinkoSolar, Sumitomo, ACWA Power, BTU, EDF, JERA, Kepco, Powertek, Kyuden, Sembcorp, Osaka, Total *** Not included in total capacity given TAQA stake in whole smelter (powered by a captive power plant) 17 TAQɅ
View entire presentation