Investor Presentaiton
▲
COPPER NORTH
MINING CORP.
Feasibility Engineering
Carmacks Project
Continuing to Build Value – Next Steps
-
Advance metallurgical process engineering to feasibility level (Q4 2019/Q1 2020), focusing on:
reducing process plant capital costs (target 8% CAPEX reduction); and,
optimizing the process to minimize reagent requirements (target 4% process cost reduction).
Update costing on existing permitted project designs (mining and waste rock management,
infrastructure)
Environmental and Permitting
Project is partially permitted with a Quartz Mining License (QML) for the previous heap leach plan -
previous mine plan, waste rock management plan, access road upgrading designs in the PEA remain
the same as those covered by the QML - further environmental assessment is required to incorporate
the revised metallurgical plan and tailings management in an updated QML
➤ Submission of updated Project Description for YESAB review (H1 2020 submission with expected
approval H1 2021).
➤ New Quartz Mining Licence to replace current QML (H1 2021).
➤ Type A Water Licence (following YESAB review; H1 2022).
Financing
Seeking a joint-venture partner for the Project
➤ Continued equity raises in pace with workplan - also will consider a small royalty
Consider metal offtake opportunities for cathode copper.
TSX.V: COL
Project Financing - to be pursued on completion of Feasibility Study
Carmacks Next Steps