Sembehun Project Feasibility and Market Dynamics slide image

Sembehun Project Feasibility and Market Dynamics

850000 Area 1 - Mine Life Extension Program (cont.) Sierra Rutile Limited While the mine life extension work program underway is focussed on the Pejebu and Ndendemoia deposits, Area 1 holds Mineral Resources across a number of deposits that will be investigated for conversion to Ore Reserves over time. Area 1 Deposits 245478v01 ML 2134 800000 TANINAHUN 6.8Mt @ 1.0% rutile 2.5Mt @ 1.4% rutile MOGBWEMO 0.7Mt @ 1.0% rutile ML 2134 GANGAMA 34.5 Mt @ 1.4% rutile 11.8Mt @ 1.4% rutile GBENI 27.8Mt @ 1.1% rutile 19.0Mt @ 1.3% rutile HM Resources HM Reserves Previous Mining SRL Mining Lease ML2134 LANTI 46.5Mt @ 1.1% rutile 4.9Mt @ 1.8% rutile 800000 Freetown NDENDEMOIA 18.3Mt @ 1.0% rutile PEJEBU 23.4Mt @ 1.0% rutile Area 1 - Current Reserve by Deposit¹ Deposit Gangama (inc ROM) Material Tonnes (Mt) In Situ Rutile (%) 11.8 In Situ Rutile (Mt) 1.4 0.17 Gbeni North 19.0 1.3 0.25 Lanti 4.9 1.8 0.09 Taninahun 2.5 1.4 0.04 TOTAL 38.2 1.4 0.54 Area 1 - Target Resources in Mine Life Extension Program¹ Deposit Material Tonnes (Mt) In Situ Rutile (%) In Situ Rutile (Mt) Pejebu MOSAVI 47.4Mt @0.7% rutile 850000 Indicated 18.6 1.0 0.18 Inferred 4.8 1.0 0.05 ML 2134 Ndendemoia East 0 1km WGS 1984 UTM Zone 28N Indicated 14.3 1.1 0.16 Ndendemoia West Indicated 4.0 0.6 0.03 TOTAL 41.7 1.0 0.40 14 Note: (1) Ore Reserve and Mineral Resource estimate as at 31 December 2021. Please see Appendices F and G for more information.
View entire presentation