Investor Presentaiton
2023 Alaska Investor Trip
Pikka Phase 1 Development Concept
Pikka Phase 1 builds out initial processing facility, drill site, seawater treatment plant and operations pad
Colville River
Boat
Launch
shject Line 6
Waterject Line 10"
utase Line 24"
Gas Line a
TOSA ower and Fiber
4
Development Schematic(1)
G&I
5
NPF
ND-B Pipelines,
2
Facilities
1 Nanushuk Drillsite B (NDB)
2
Nanushuk Processing
Facility (NPF)
43 producer/injector wells
Modular design
approach with 80 MBOPD
processing capability
3
Seawater Treatment Plant
(STP)
100 MBWPD capacity
expandable to 150/200
MBWPD
4
Pipelines
Over 100 miles of oil, gas,
and water pipelines
5
Grind and Inject (G&I)
6
Operations Pad (NOP)
7
Tie-In Pad (TIP)
OSA P
NOP
6
NPF to TIP Pipelines
MC7903
Sales Of 14port
Seaware Line 16
Gase 8
ENI OPP
STP Pipelines
Gas Line 6
Seawater Line 16
Third-Party Fibe
OSA STP
KRU CPF3
3
Mustang
Mustang Road
Spine Road
Tie-In Pad
(TO1)
7
KRU CPF2
Sales Oil Tie-In 12-
Hot Tap/
e-in Platform (102)
PIC/KTC Fiber
Kuparuk
Pipeline
Extension
(1) Kuparuk River Unit (KRU), operated by ConocoPhillips, and ENI facilities shown for reference only.
Tarn-Meltwater Road to DS-2P
Gos Spur sine 12
Spine Road
Santos
KRU CPF1
To Deadhorse
TO PSI
Fuel Gas Tie-In
(103)
Oliktok Gas Line
24
24View entire presentation