History and Future Strategy of Oando slide image

History and Future Strategy of Oando

Summary of Rig Contracts Passion Operating Rate with Drill Pipe (US$) Low $90,000s for extension period Respect Oando Low $80,000s for initial term Term of Contract Early Termination Provision (US$) 2 years with optional 1 year extension Shell Petroleum Development Company (SPDC) suspended the contract after the initial 2 year term. The contract was re- activated in June 2015 for an additional six month term which ends in December 2015. There is a possibility of SPDC extending for an additional 6 months. Not applicable during the extension period 2 years with optional 1 year extension ⚫ Chevron Nigeria Limited (CNL) contracted the rig in October 2015 for its swamp drilling campaign. The CNL contract is for 2 firm years with a possibility of extending for an additional year. Not applicable (24)
View entire presentation