Acquisition of Khoemacau slide image

Acquisition of Khoemacau

MMG well positioned to deliver on expansion project Khoemacau has a low-risk expansion plan • • Strong in-country team • Favourable metallurgy Longhole stoping mining method, similar to Dugald River operations Demonstrated track record of delivering major projects % of nameplate ore milled vs McNulty Type 11 120% McNulty Type 1 Las Bambas ore milled Dugald River ore milled 100% • Pastefill (to be built at Khoemacau, similar to Dugald River operations) • Continuous top down sequence of mining (higher development rates) 80% • Favourable geotechnical conditions (large stope sizes) MMG project development credentials 60% • Las Bambas commissioned 2016 (achieved 103% nameplate in 6 months) 40% • Dugald River commissioned 2017 (achieved 107% nameplate in 7 months) • Kinsevere expansion on track to extend mine life and increase production 20% • Experience operating in a variety of jurisdictions including Africa • Experience operating a variety projects from ~1Mtpa to >50Mtpa The McNulty Type 1 curve is considered the benchmark for successful project implementation² 0% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Months Notes: 1. McNulty, T, 2014. Plant Ramp-Up Profiles: An update with emphasis on process development, in COM 2014 and MMG analysis. 2. Type 1 curve represents ramp-up performance of mature technology, standard equipment and/or thorough testing. 11 M MMG
View entire presentation