Mako Gold Investment Presentation
225,000 mE
Mako Gold
GOGBALA - TO BE INCLUDED IN MAIDEN RESOURCE
4m @2.72g/t Au
11m @ 1.67g/t Au
6m @ 4.97g/t Au
1,005,000
3m @ 6.40g/t Au
8m @ 1.27g/t Au
2m @ 16.81g/t Au and
5m @ 2.12g/t Au
6m @ 2.00g/t Au
2km
225,500 mE
1,004,500 mN
7m @ 2.73g/t Au
4m @ 2.63g/t Au
226,000 mE
4m @ 1.25g/t Au and
9m @1.00g/t Au
7m @ 1.22g/t Au
4m @ 1.38g/t Au and
11m @ 1.10g/t Au and
5m @ 2.38g/t Au
23m @ 1.81g/t Au
9m 2.52g/t Au
8m @ 4.29g/t Au
[email protected]/t Au
2m @ 4.10g/t Au
10,000m of RC/DD drilling underway
Wide and high-grade gold mineralisation
outlined over 2km in wide-spaced drilling
Structure and mineralisation similar to
Tchaga with same stacked lodes
Select drill results include¹
◆ 20m at 3.41g/t Au from 19m
•
12m at 5.39g/t Au from 11m
11m @ 1.56g/t Au
♦
23m at 1.81g/t Au from 19m
Drill Hole Collar
(Au gram metres)
>50
♦
2m at 16.81g/t Au from 2m
10 to 50
◆
8m at 4.29g/t Au from 82m
1m @ 8.78g/t Au
12m @ 5.39g/t Au
1,004,000-
| 6m @ 2.67g/t Au
5 to 10
1 to 5
<1
Pending assays
Gold Soil Contour
+40 ppb Au
200m
Structure
7m @ 1.42g/t Au
• Napie fault (D1)
-Later fault (D2)
1 Refer to ASX announcements dated 9 July 2018, 13 March 2019, 15 March 2021 and 6 October 2021
♦ 17m at 1.68g/t Au from 45m
♦ 6m at 4.97g/t Au from 68m
14View entire presentation