Eguana - Fully Integrated Stack slide image

Eguana - Fully Integrated Stack

T THE POWER GRID PROBLEM Electricity needs to double in 30 years One way power flow results in poor reliability Requires massive capital deployment to manage Cannot sustain the electric vehicle movement Traditional Grid Distributed Grid (Addresses Problem) +$60Bn North American solar + storage market by 2030 Traditional Grid • • Fossil fuel driven, massive capital requirements +20 year time horizons with no policy support Reactive no demand control means an overbuild on supply Distributed Grid Fully integrated - distributed generation is fast, secure, and reliable Efficiency time shifting supply and demand within a coordinated system Cost Effective - incremental transition avoids disruption and stranded assets New assets work as "fleets" or "aggregated" systems 5
View entire presentation