Investor Presentaiton
BALLARD Global Manufacturing Capacity
Vancouver Capacity 2019
2020+ ~2025*
MEAS
1.0m
6.0m
10.2m
Gigawatt Equivalent 0.24
1.66
2.90
Vehicle Equivalent* 2k
12k
20k
Stack Assembly
2.6k
27k
27k
Hobro HD Capacity
FCmove TM Module Assembly
2019
2020
2023*
50
100
Gigawatt Equivalent
0.24
1.66
1.66
HD Module Assembly
0.2k
5k
10k
Ballard
Power
Systems
Ballard
Europe
MEA Manufacturing
Stack Assembly
Module Assembly
Weichai Ballard Hy-Energy JV (WBHE)
WBHE Capacity
2019
2020t
~2025*
Stack Assembly
34k
67k
Gigawatt Equivalent
2.02
4.21
Vehicle Equivalent*
17k
34k
HD Module Assembly
0.5k
20k
67k
Power to Change the World
† Installed capacity expected at end of 2020, based on 24hr x 7 days/week operation, 350 days/year
Building infrastructure designed to accommodate additional capacity expansion within 1 year
* Vehicle equivalent based on 70kW FCmove, 500 cells