Investor Presentaiton slide image

Investor Presentaiton

Production costs The table below shows a breakdown of Verde's production costs for BAKSⓇ and K Forte®, and what percentage of those costs is not controllable by management: Projected cost per tonne of product for 2023 (C$) (¹) K ForteⓇ Bulk (Plant 1) K ForteⓇ Bulk (Plant 2) Total cost expected Non-controllable costs Cash cost Assets depreciation for 2023 (2) (% of total costs) 20.2 3.8 24.0 61% 10.2 2.8 13.0 58% K Forte® Big Bag (Plant 1) 30.4 2.8 33.2 71% BAKS® (2%S 0.2%B) (3) Bulk (Plant 1) 42.1 3.8 45.9 81% BAKS® (2%S 0.2%B) Big Bag (Plant 1) 51.3 3.8 55.0 85% 1- The costs were estimated based on the following assumptions: Costs in line with Verde's 2023 budget. Sales volume of 1.0Mt per year. Crude Oil WTI (NYM U$/bbl) = US$80.00. Diesel price = U$$1.26. Currency exchange rate: US$1.00 = R$5.25; C$1.00 = R$ 4.20. Total cost per tonne includes all costs directly related to production and feedstock extraction in addition to assets depreciation 2 - Total cost per tonne includes labor mining, mining, crushing, processing, maintenance of support facilities, product transportation from mine pits to production plants, laboratory expenses, G&A, and environmental compensation expenses. 3- BAKSⓇ can be customized according to the crop's needs, so it can have several compositions. The 2%S 0.2% B composition is responsible for most of Verde's sales. TSX: NPK OTCMKTS: VNPKF со 20
View entire presentation