2 Case study: Riyadh lines 4,5 & 6 metro system ■ Scope • • 69 driverless Metropolis trains Signalling system Infrastructure: third rail and track, using Appitrack and power supply incl. Hesop substations ■ Status • Train production started in Katowice in Nov. 2015 Customer: Arriyadh Development Authority Contract: 2013 - 2018 Lines length: 65.1 km # of stations: 25 First driverless metro in Saudi Arabia and biggest contract ever for an urban system project (€1.2bn) ALSTOM - February 2016 - P 38 ALSTOM 2016. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. ALSTOM