Gwalia gold production - 136 koz in H1
AISC
(A$/oz)
883
FY15 AISC A$841/oz
645
860
692
846
Mined Grade
(g/t Au)
9.7
9.7
8.6
June 2015
Reserve grade
9.4 g/t Au
9.0
FY15 average grade 8.9 g/t Au
Production (koz)
77.0
68.6
57.2
7.9
72.4
63.5
FY 15
Q2 Dec
FY 15
Q3 Mar
FY 15
Q4 Jun
FY16
Q1 Sep
FY16
Q2 Dec
12/Asia Investor Relations Roadshow / March 2016
St Barbara
LIMITED
Q2 December FY16 Quarter:
> 63,533 oz produced in Q2 (Q1: 72,388 oz)
> 135,921 oz produced in H1 FY16
> AISCĀ¹ of A$846/oz (Q1: A$692/oz)
> Production in Q2 less than Q1 due to lower
grade, partially offset by processing of
stockpiles from previous quarter
>
Ore grade fluctuates within mine
sequence and will vary from Q to Q
Ore containing an estimated 1,000 oz of
gold was stockpiled at the end of Q2
(5,500 oz at end of Q1)
> FY 16 Guidance revised:
>
Production of between 245 - 260 koz
(was 230-250 koz)
AISC of between A$840/oz and
A$900/oz (was A$875/oz - A$940/oz)
1.