Investor Presentaiton
Asset Geography and Development Overview
2023 Alaska Investor Trip
Pikka Phase 1 Project Overview
The right project at the right time in the right location
Key Metrics
Development plan
First oil
Nameplate capacity
Expected plateau duration
2P Reserves
Optimised using existing pipeline
capacity, single small footprint drilling
pad and electrified field operations
2026
80,000 barrels of oil per day gross
~5-6 years
397 mmbbl gross pre-royalties
165 mmbbl Santos-share at 51%
interest (net of 18.67% royalties)
Permitted Pads
Built Pad
NOP
NPF
Built Roads
Permitted Roads
Pikka Pipelines
Pikka Unit
Nanushuk Pay
Alpine C Pay.
Pikka Phase 1 Wells
NPRA
State Lands
US$2.6 billion gross (2022 real)
Capex to nameplate capacity US$1.3 billion Santos-share at 51%
Annual opex in production
Forecast IRR
Lifecycle breakeven oil price
interest
~US$150 million gross
~19% @ US$60 per barrel long-term oil
price (2022 real)
~US$40 per barrel
NDB
Pikka
Unit
Santos
N
0
2.5
5
Miles
Phase 1 gravel
pads and roads are built
and
All key permits are in place
25View entire presentation