Investor Presentaiton
Capital (USD $)
57,575
REA SURVEYS OF 200 SITES IN 5 STATES PROVIDE QUANTITATIVE
EVIDENCE FOR MINIGRID OPPORTUNITY-SAMPLE SITE: GIERE, SOKOTO
Capital cost:
Solar PV + installation
Battery + installation
No diesel constraint
Size
82.25 kW
Diesel limited to 20%
Size
225 kW
Diesel limited to 50%
Size
Capital (USD $)
Capital (USD $)
145 kW
101,500
157,500
832 kWh
180,900
1420 kWh
308,700
Diesel Generator
60 kW
21,877
60 kW
21,877
5 kW
5,760
Inverter
62 kW
13,132
62 kW
13,132
60 kW
12,558
MPPT Charge
controller
15,338
23,800
Network + distribution
6.15 km
77,415
6.15 km
77,415
6.15 km
77,415
Network Design:
Name
Length (km) Capital (USD $)
Weasel
5.19
62,290
Ferret
0.30
3,854
Rabbit
0.40
5,655
Dog
0.17
3,465
Dingo
0.06
1,371
Panther
0.03
780
Generation System: USD 170,000 (min)
Distribution System: USD 77, 415
Estimate Capex: $247,415
RURAL ELECTRIFICATION AGENCY Source: REA surveys and RMI analysis
Network Layout
20