Acquisition of BASX Solutions slide image

Acquisition of BASX Solutions

Investing For Growth - Longview Facility AAON カル • • . • In 2021, AAON's new 210,000 sq. ft. facility (the bright white facility on the right in the top left picture), which nearly doubled capacity of the existing 263,000 sq. ft. facility, became operable. The expansion is used for both equipment and coil warehouse storage, reduced production time and improved overall efficiency. Our Longview facility manufactures air handling units, split systems, small chillers, and coils. ⚫ Starting in 2023, our Longview facility will also begin manufacturing BasX equipment. This will help absorb the robust growth the BasX business is realizing. 14
View entire presentation