Installed
Capacity
Under
Construction
Awaiting
Clearances
Power ܀
PHYSICAL SNAPSHOT
Stations under
(5551 MW*)
Operation-22 Nos.
Power Stations with Subsidiary (NHDC) -2 Nos.
(1520 MW)
Total Operational Projects - 24 Nos. (7071 MW)
✰ Projects Under Construction (including
Subsidiary & JV) :-
• Hydro - 5 Nos. (4924 MW)
Projects Awaiting Clearances: -
Standalone - 5 Nos. (4995 MW)
•
•
Joint Venture - 3 Nos. (2160 MW)
Subsidiary 1 No. (66 MW)
5
Hydro Power is 12% (45699 MW) of
All India Installed Capacity (371054
MW**).
NHPC Contribution is 15% of Installed
Hydro Power On Consolidated Basis.
Status
Capacity (MW)
Operational Projects
7,071
Projects Under Construction
4,924
(including Subsidiary & JV)
Projects Under Clearance:
Stand alone
JV Projects
Subsidiaries
Projects Under Pipeline
Total
4,995
2,160
66
800
20,016
Under
Pipeline
✰ Projects under Pipeline 1 No. (800 MW)
*
MW Solar Power Project, Tamilnadu.
Including 50 MW Wind Power Project, Jaisalmer & 50
**Source-CEA as on 30.06.2020