Paradox Lithium Project Update
For personal use only
PARADOX PROJECT - COMPELLING POSITION AMONGST DLE PEERS
✓ Advanced Development Stage - DFS Complete
✓ Proven Technology Partner
Production/Construction
✓ Bromine & Boron co-product upside
✓ Tier 1 Location
ANSON
RESOURCES
Company
Livent
Lanke
Lithium
(Minmetals)
Zangge
Lithium
Jintai
Lithium
Tibet
National
Yiwei
Lithium
(EVE Energy)
Eramet/ Anson
Tsingshan Resources
Vulcan
Energy
Rio Tinto
Standard Lake
Lithium Resources
Controlled Compass
Thermal Minerals
Project
Hombre Yiliping Lake
Chalkhan
Lake
Mahai Lake
Qinghai
Qinghai Salt
Lake
Centenario
Paradox
Lithium
Zero Carbon
lithium
'Rincon Salar Smackover
Kachi
Salton Sea
Ogden,
Great Salt
lake
Country/
S&P LT Rating
Argentina China
CCC+
A+
China
A+
China
A+
China
A+
China
A+
Argentina USA
Germany Argentina
CCC+ AA+ rating AAA
CCC+
USA
AA+
Argentina
CCC+
USA
USA
AA+
AA+
DLE Provider Proprietary Sunresin Sunresin Sunresin Sunresin Sunresin Proprietary Sunresin Proprietary Undisclosed Proprietary Lilac
Lilac
Energy
Source
Minerals
Project/Study
Stage
Production
Target (LCE)
Co-Product
Producing Producing Producing Producing Commissioning Construction Construction
DFS
DFS
Phase 1
DFS/FEED
PFS
PFS
PFS
PFS
50ktpa
5ktpa
10ktpa
7ktpa
8.8ktpa¹ 10ktpa
24ktpa
13ktpa
21.12ktpa¹
50ktpa
22.5ktpa
25.5ktpa³
25ktpa
11ktpa
Bromine,
Boron4
HCI, NaOCI
Salt, SOP
Opex (US$/t LCE)
n/a
n/a
n/a
n/a
n/a
n/a
3,500
4,368
4,6212
2,968
4,319
4,178
n/a
Note - Based on publicly available information, refer to appendix for sources. For projects which are not producing or in construction, the production targets are based on most recent technical study, such as a feasibility study. Future
expansions and Phase 2 production targets are excluded from this analysis. 1- EVE Energy 10ktpa Lithium Hydroxide and Vulcan Phase 1 DFS production target of 24ktpa Lithium Hydroxide, converted to Lithium Carbonate Equivalent
using conversion ratio of 0.88. 2 - Opex converted from Euro to USD using 1.06 EUR:USD FX rate, as of 3 March 2023. 3 - Lake Resources released Preliminary Feasibility Study on 17 March 2021 with 25.5ktpa production target, subsequently
Lake has announced intention to target 50ktpa LCE in the DFS, targeted for release in Q1 2023. 4 - Bromine and Boron co-products were not assessed in Anson's Paradox Lithium Project Definitive Feasibility Study.
Anson Resources | ASX: ASN
4,400
11View entire presentation