Investor Presentaiton slide image

Investor Presentaiton

Geology & Mining: Gabanintha South Ore Reserve Table¹ (original AVL Reserve) Australian VANADIUM LIMITED The updated Ore Reserve for the Australian Vanadium Project 2022 Bankable Feasibility Study is detailed in the table below Ore Reserve Proved Probable Total Ore Mt V205% Fe2O3% TiO2% SiO2% LOI% 10.5 1.11 61.6 12.8 9.5 3.7 V205 production kt 70.9 Ore Reserve Waste Mt 238.5 20.4 1.07 63.4 12.2 9.2 3.0 152.9 Total Material 269.4 30.9 1.09 62.8 12.4 9.3 3.2 223.8 Strip Ratio 7.7 The Ore Reserves and Inferred Resources utilised for the life of mine (LOM) schedule for the Australian Vanadium Project 2022 Bankable Feasibility Study, inclusive of the Ore Reserve above, is detailed in the table below. Ore Reserve Mt V205% Fe2O3% TiO2% SiO2% LOI% V205 production kt Proved 10.5 1.11 61.6 12.8 9.5 3.7 70.9 Ore Reserve Waste Mt 296.5 Probable 20.4 1.07 63.4 12.2 9.2 3.0 152.9 Total Material 335.7 Inferred Resources 8.2 1.04 63.4 12.0 9.2 3.1 57.6 Strip Ratio 7.6 Total Ore 39.2 1.08 62.9 12.3 9.3 3.2 281.4 The Ore Reserve for the Australian Vanadium Project 2022 Bankable Feasibility Study was developed by Orelogy Consulting Pty Ltd. The economic evaluation of the Project in this presentation is underpinned by Reserves and Inferred Resources comprising: The Ore Reserve including both Proved and Probable classified material • • Additional Inferred Mineral Resources comprising approximately 20.5% of the proposed process plant feed material 1. Note: Tonnage and contained metal have been rounded to reflect the accuracy of the estimate, and numbers might not add due to rounding Corporate Presentation | March 2024 | ASX:AVL 36
View entire presentation