2021 Work Programs slide image

2021 Work Programs

Kitano-o Gold Prospect: Long Section & Drilling Program KITANO-O GOLD PROSPECT Geological Interpretation, Gold and Antimony (ppm) in Rock-Chip, and Historic Workings 0 125 250 500 meters 4867000mN 300m 330 403.2m JAPAN GOLD CORA #50m Phase 1 Drilling West Kitano-o KID005 536.4m KTD004 2MAHB 5 KTDODT 7000m 8.6 KTD003 54. KTD002 4866000mN 0 0.5 Legend: 12.5 Gold (g/t) result Quartz vein interpretation Mapped veins (1956) Secondary access road Main access road Drainage / creek TSXV: JG | OTCQB: JGLDF KTD006 1.5 400m Contour 10m Drill hole 350m Shallow open pit outline Mine infrastructure Underground adit (from MMAJ map) Au (ppm) ≥10 5 to 10 2 to 5 Sb (ppm) ≥250 100 to 250 Tenement outline 0.5 to 2 <0.5 50 to 100 25 to 50 ▼ < 25 707000mB JAPAN GOLD CORP. Proposed area for Phase 2 Drilling East Kitano-o 4867000mN น 20.0 8.1 5.7 60.8 450m 530m 23.2 21.9 9.9 4866000mN 3 km 8. 2.5 " Lithology Sinter boulder fields Sinter outcrop Biotite rhyolite dome Obsidian Rhyolite dome Miocene volcaniclastics and volcanics Cretaceous-Jurassic basement sediments 34
View entire presentation