Investor Presentaiton
Exploration: Gwalia Deep Drilling Program
Long Section Looking West
Recent Diamond Drill Hole
Previous Diamond Drill Hole
Intersection
Recent Drilling Result
Planned Target
Main Lode
South West Branch
South Gwalia Series
West Lode
Development Stoping
GWDD131
0.3m @ 6.9g/t (ML)
4.2m @ 3.0g/t (SWB)
2.7m @ 4.3g/t (SGS)
1.2m @ 15.8g/t (WL)
GWDD17A
1.8m @2.2g/t (ML)
4.0m @ 2.7g/t (SWB)
2.2m @ 2.0g/t (SGS)
GWDD17
1.6m @6.2g/t (ML)
1.1m @ 1.6g/t (SWB)
6.5m @ 5.5g/t (SGS)
Open
Recent
Diamond Drilling-
Underground
Development
at 1,560mbs
GWDD17B
In Progress
017-022 Gwalia Drawn January 2016
St Barbara
LIMITED
GWDD13J
1.8m @ 5.9g/t (ML)
2.6m @67.2g/t (SWB)
4.1m @ 5.7g/t (SGS)
1.1m @ 3.1g/t (WL)
GWDD13K
1.4m @ 1.4g/t (ML)
3.5m @ 25.3g/t (SWB)
12.0m @ 3.0g/t (SGS)
GWDD13L
250m
1,500mbs
1,800mbs
2,000mbs
Lode
Extensions
0.6m @ 2.7g/t (ML)
3.9m @0.9g/t (SWB)
11.2m 5.6g/t (SGS)
2,200mbs
Gwalia Deep Drilling Program
The full drilling program is aimed at
delineating an indicated resource to
support the planned shaft studies.
Refer reportĀ¹ for full results of recent 6
holes that successfully intersected
mine sequence
> South West Branch intercepts similar to
1,100 1,300 mbs, significantly thinner
to levels currently being mined and in
reserve.
Further drilling through until Q1 Sep
FY17 is planned to complete the
program.
> Program expected to create additional
reserves (based on trucking). Materials.
handling studies will continue.
1.
For full explanation and results refer to ASX release 21 January 2016 'Quarterly Report December 2015'
17 Asia Investor Relations Roadshow / March 2016View entire presentation