Investor Presentaiton
Technology Development Process
Readiness
Phase
MRL
Product
Development
Cycle
Stage owner
Definition for PTC
MRL 1
Pre
development
MRL 2
decision
MRL 3
Gate
4
Critical for
PTC
Low-rate
initial
production
MRL 9
Initial
Production
R&D team under
CTO
Solution
Analysis
MRL 4
Concept
Initiation
Gate
1
Critical for
PTC
MRL 5
Technology
Maturation &
Risk
Reduction
Concept &
Technology
Development
MRL 6
Gate
2
Critical for
PTC
MRL 7
Product
Development
Engineering
& Mfg.
Development
Gate
3.
MRL 8
Product
Development
Technology
Development
team under
CTO
Documentation of basic idea
and identified potential
applications and identification
of basic mfg. implications
Technology concept and/or
application formulated, and
mfg. concept developed
Manufacturing proof of
concept developed
Capability to produce the
technology in a
laboratory environment
Capability to produce
prototype components in a
production relevant
environment
Capability to produce a
prototype systems or
subsystem in a production
relevant environment.
Capability to produce systems,
sub systems or components in
a production representative
environment.
Pilot line capability
demonstrated. Ready to begin
low-rate production
Low-rate production
demonstrated.
Critical
milestone #1
Critical
milestone #2
Technology
adoption
decision
Technology
Solution
Analysis
Technology
maturation &
risk reduction
Engineering &
Manufacturing
Development
Production &
Deployment
Operations &
Support
Technology Acquisition
Technology Absorption
Technology
adoption decision
2
Technology
solution Analysis
3
5
Critical Milestone #1
Tech. maturation &
risk reduction
Critical Milestone
#2
To be decided
Technology
adoption
decision
Technology
Solution
Analysis
Technology
maturation &
risk reduction
Technology Acquisition
Critical
milestone #3
Critical
milestone #4
Engineering &
Manufacturing
Production &
Deployment
Operations
& Support
Development
Technology Absorption
Gate
5
Full-rate
production
MRL
10
CFT invoicing
Technical team
(under CTO), BE
and Ops.
Capability in place to begin
Full Rate Production.
2
Rate
Production
Operations
Team only
Full rate production
demonstrated and lean
production practices in place.
Engineering & Mfg.
Development
Critical Milestone #3
3
Production &
Deployment
Critical Milestone
#4
5
Operations &
Support
PTC