Investor Presentaiton
ENGIE
Investor Presentation
REGULATORY CHANGE (1/3)
OSINERG MIN approved a regulation to determine the variable costs of gas*
Supply
Corresponds to the quotient between the amount paid for the energy.
consumed and the volume consumed. The TOP is not considered
Will be equal to the rate applicable to the firm transportation service as long I
Transportation I as interruptible volume is not consumed. If it is consumed, the rate
I increases since a factor of use of the system is applied.
Distribution
Will be equal to the rate applicable to the distribution service as long as the I
I volume consumed is equal to the contracted capacity, otherwise the price is
affected by a factor
It will be effective
from July 1, it will
be equal to the
I total costs (fixed + 1
variables) and in
general it will
match the sum of
the unit price of
supply,
transportation and
distribution
*Resolution of the board of directors, Supervisory Agency for Investment in Energy and Mining OSINERGMIN N° 092-2021-OS/CD
ENGIE Energía Perú
9View entire presentation