PTTEP Energy Project Overview
Projects Update Q3/2022
PTTEP
Thailand
Malaysia
G1/61 Erawan Current gas production 210 MMSCFD. 1st ramp-up target mid 2023.
Total 4 WHPs have been installed with additional 4 WHPS within 2022.
MTJDA Granted rights for additional exploration area and 10-year PSC extension to
2039. Add gas volume to Thailand at least 30 MMSCFD until 2025.
SK410B Continue exploration campaign, another exploration well under result
evaluation.
Zawtika Minimal impact from gas pipeline leakage, fully repaired within 2 weeks.
Continue drilling activities to maintain production with new phase 1D.
*
Myanmar
G2P Ongoing preparation works
PTTEP is participating in
24th Gulf of Thailand Bid Round
PSC Scheme
• Exploration 6 + 3 Yrs.
Production 20 + 10 Yrs.
•
Abu Dhabi Offshore 1 and 3
UAE
Abu Dhabi Offshore 2
Currently being evaluated for petroleum potential for future exploration
Announced gas discovery approx. 2.5-3.5 TCF.
Further drillings to appraise full block potential.
Sharjah Onshore Area A
Farm-in to acquire 25% stake. Project is in exploration phase.
Algeria
HBR Oil production commenced. Expect daily production in Q4/22 ~13 KBPD.
Mozambique
MZA1 Construction to resume pending security situation
Brazil
Portfolio Rationalization Divestment
9
Total 3 Blocks on Offer
G1/65 ~84,000 sq.km.
G2/65 ~15,000 sq.km.
G3/65
11,500 sq.km.
Feb 2023
Timeline
Announcement
of Successful
Mid Sep 2022
Bid Submission
May to Sep 2022
Data room
Apr 2022
Announcement
Bid OpeningView entire presentation