Endeavour Mining Investor Presentation Deck slide image

Endeavour Mining Investor Presentation Deck

LE PLAQUE Updated resources extended mineralisation INSIGHTS > During the 2021 drilling campaign, an updated mineral resource was defined at Le Plaque, extending mineralisation towards Le Plaque SW and at depth at Delta Extension > The high grade Le Plaque deposit has been extended to the south towards Delta Extension and Le Plaque southwest. Resource ore type is 77% fresh and the strip ratio is expected to be in line with the previous Le Plaque resource, where mining began in late 2021 > Mineralisation remains open to the southwest and at depth, with significant high-grade mineralisation identified outside of the current resource pit shell. At Delta Extension, the mineralisation continues at depth and further exploration will explore the underground resource potential > A maiden Inferred resource was declared at Yopleu- Legaleu. Mineralisation is 56% fresh ore and the strip ratio is expected to be significantly lower than that of Le Plaque. Mineralisation is open at depth and along strike and a second phase of drilling is planned as part of the 2022 exploration programme 0 Le Plaque Exploration Targets FL20-1576 6.9m @ 13.41 g/t Au incl. 1.7m @ 47.60 g/t Au FL20-1589 2.6m@ 14.09 g/t Au incl. 1.7m @ 19.93 g/t Au 1.7 m @2.17 g/t Au FL20-1592 4.3m @ 3.15g/t Au FL20-1598 1.8m @3.69 g/t Au 2.8m @ 13.92 g/t Au incl. 1.1m @ 33.6 g/t Au FL20-1585, 7.8m @ 6.40 g/t Au incl. 0.9m @ 39.90 g/t Au 5.2 [email protected] g/t Au FL21-1638 3.0m @ 6.22 g/t Au Incl. [email protected] g/t Au 5.4m @5.36 g/t Au incl. 1.5m @ 14.25 g/t Au FL20-1556 [email protected] g/t Au incl. 0.7m @ 38.7 g/t Au FL20-1564 4.5m @ 2.96 g/t Au incl. 0.7m @ 13.2 g/t Au 500 metres FL20-1635 [email protected] g/t Au incl. 4.3m @ 40.58 g/t Au Le Plaque Main 1000 Delta-Extension South FL21-1643 5.1m @2.30 g/t Au 1.7m @ 50.34 git Au incl. 0.8m @ 104.9 g/t Au 1.2m @ 152.0 g/t Au Plaque SW 90% Section Epsilon N LT-73 Epsilon Beta Delta Extension Delta 1 Yopleu-Legaleu FL20-1379 FL20-1628 3.7m @33.61 g/t Au 7.4m @ 20.49 g/t Au incl. 2.2m @ 61.00 g/t Au incl. 0.7m @ 132.7 g/t Au Le Plaque SE ā˜ ENDEAVOUR FL21-1640 2.9m @28.67 g/t Au incl. 0.4m @ 164.9 g/t Au 4.5m @17.17 g/t Au 5.2m @ 7.87 g/t Au incl. [email protected] g/t Au MINING Drilled After 1st July 2020 DD RC Results Pending ODD RC AN Drilled Prior to 1st July 2020 RC, DD, RC-DD Planned Drilling RC June 2020 $1500 Pit Mineralization Cavally Ri Mineralisation Geology Biotitic Gneiss (Zeitouo) Carbonate-Skarn Corridor Granodiorite Intrusive Diorite Mafic Meta Volcano-Sediments Detritic Sediments 66
View entire presentation