Investor Presentaiton slide image

Investor Presentaiton

Key Infrastructure (1/5) Bayan's key vessel loading infrastructure has been the cornerstone of the Group's growth strategy. The majority of the development in recent years has been focused on expansion of the Senyiur Jetty to support the Tabang mine ramp-up Key Assets Balikpapan Coal Terminal ("BCT") Land- based Coal Terminal AEGEAN BULK Overview ✓ One of the largest coal terminals in Indonesia; handled more than 217 Mt of coal and loaded more than 3,864 vessels since 1995, supporting Tabang and TSA/FKP 2 x Shiploaders rated at 4,000 tph each ✓ Current handling throughput capacity of 24.0 Mtpa expanding to 40 Mtpa+ with the addition of a new out loading jetty, shiploader(s) and in loading capacity. ✓ Stockpile capacity of c. 1.0 Mt (across 14 stockpiles), further expansion being completed in 2021 to c. 1.5Mt ✓ Can fully load large Panamax vessels and partially load Capesize vessels ✓ Managed by Dermaga Perkasapratama, 87.4% owned by Bayan Kalimantan Floating Transfer facility ("KFT") BEA HERMES 11 2 x Floating Transfer facilities KFT-1 and KFT-2 currently both support Tabang coal mining operations and are located offshore Balikpapan. KFT-1 is able to unload / shipload 4,000 tph and has stockpiling capacity of 45 kt KFT-2 is able to unload / shipload 6,000 tph and has stockpiling capacity of 60 kt Either can be moved to take advantage of location and avoid bad weather and can be positioned to load Capesize vessels Managed by Muji Lines / Bara Tabang PT BAYAN RESOURCES Tbk.
View entire presentation