Acquisition of Khoemacau
Map of expansion operations
Map of expansion operations
N
Grid substation
11
National
Grid
Haka
wellfield
Legend
10
Transmission Line
Haka Pipeline
Access Road
Mining Lease
Haka
pipeline
Road
Highway
Overview of expansion operations
Mining
1 Zone 5 mine expanded from 3.65Mtpa to 4.5Mtpa (three declines)
New mines at Zone 5 North, Zeta North-East, and Mango, replicating
twin decline system proven at Zone 5 to add 3.65Mtpa
Deposits are open at depth, unlocking extension options
234
Access road
Boseto 10
wellfield
Boseto processing
plant
5
26
26
0 KM 5
6
TSF
132kv
Transmission line
9
Haulage road
4
Zeta NE
Zone 5N
Workshop &
accommodation
8
Processing
Plant
6
7
Mango
1
TSF
Zone 5
U/G
Existing infrastructure
Expansion infrastructure
Processing
56
Infrastructure
9
Concentrate
Existing Boseto plant will switch to treating the expansion deposits
New 4.5Mtpa processing plant dedicated to processing Zone 5 ores
Expansion deposits show similar metallurgy to Zone 5
New tailings storage facility constructed in close proximity to the new
processing plant
Ore to Boseto hauled via existing sealed roads with existing
infrastructure able to deliver the expansion
10
Multiple water sources from Boseto and Haka wellfields, with mine
dewatering meeting expansion requirements
11
Powerline to grid is sized to accommodate the expansion with further
capacity via future solar power plant
Testwork has demonstrated concentrate quality will be similar to that
from Zone 5, which is successfully sold on competitive terms
M