Murphy West Uranium Project Overview
Nabarlek Project: 2023 Drill Campaign Underway
Focus on two uranium faults systems
Nabarlek Fault
•
.
•
Hosts the historical Nabarlek Mine
Recent uranium equivalent (eU3O8) intercepts are at
the unconformity north and south of Nabarlek
Associated with near fracture hosted uranium in
dolerite (Nabarlek South) from 2022 drilling
U40 Fault
•
•
Previous high-grade uranium intercepts at U40
Prospect (incl 6.0m @ 7.6% U3Og from 75m)
8
2023 step-out drilling continues to identify high-grade
uranium on U40 Fault - open to south
U40 Fault interpreted to link up with uranium
mineralisation at U42 Prospect
315 000mE
Nabarlek North
Nabarlek Fault
NABARLEK MINE
24Mlbs @ 1.84% U₁₂O
(PRODUCED)
Gabo Fault
Overload
5km
GC11
Nabarlek South
North Fault
North Buffalo
Coopers
KP
325 000mE
U40
U42
RC & Diamond Drill Holes
UO ppm (max assays)
>1000
500 - 1000
<500
All weather airstrip & camp
Excised
DevEx Tenure
Mining License
Kombolgie Sandstone
Unconformity
Granite Outcrop
Basement Geology
U40 Fault
8 635 000 mN
Drill campaign continues to deliver with strong uranium
hits across multiple prospects
"
8
8 645 000 mNView entire presentation