Strong Bidding Pipeline slide image

Strong Bidding Pipeline

SKIPPER | Transmission Line Tower Testing Station Limited USP *** $KIPPER R&D Skipper USP • Towers upto 1200kV with 110m height (highest in the country) can be tested seamlessly Automated central loading and supervision system to regulate the actual loading • Customized designs by our Designers for optimum efficiency • Dual-speed VFD Driven Electrical Winches for smooth loading • Exceptionally heavy Towers can be loaded optimally (1000t per leg) and large base width (up to 35m) Skipper's dedicated in-house R&D center allows study and up gradation of various Transmission Tower Testing methodologies. The center helps our team offer customized and breakthrough solutions to our clients every time Test Bed Key Features • Maximum Test Tower Base Width • Maximum Test Tower Height • Maximum Compression / Uplift per Leg • Allowable Overturning Moment • Maximum Cross Arm Spread • Maximum Transverse Wire Load • Maximum Longitudinal Wire Load • Maximum Vertical Wire Load • Load Application System Load Measurement System • Material Testing and Calibration • Tower Erection through -35M x 35M -110M -1000T - 60,000 T-M -70M -120T per point -80T per point -60T per point -60 Nos. 5T & 10T capacity Electrically Operated Winches - Stain Gauge Type Load Cell - 60t digital UTM -10t Tower Crane 16
View entire presentation