Investor Presentaiton

All in sustaining cost (US$/oz) Tier 1 project - Soto Norte vs. large gold producing mines LOM Annual production vs. LOM AISC 1,100 1,000 Ahafo KCGM Sukari Boddington Lihir Tarkwa 900 La Herradura Malartic Tropicana Obuasi Paracatu Pueblo Viejo Cadia Hill 800 Loulo-Gounkoto 700 Akyem Vasilkovskoye Tanami Ops Tasiast Natalka Penasquito Cortez Detour Lake Yanacocha 600 Turquoise Ridge Brucejack 500 400 Soto Norte Kibali Legend 40Moz 20Moz 10Moz Olimpiada 300 300 400 500 600 700 800 900 1000 Annual Production (K oz Au) Notes: 1. Source: S&P Global, company filings Large producing primary gold mines include those with production over 400 koz per year 2. LOM average production per annum 3. LOM average AISC, net of by-products 4. Bubble size represents contained total resources in Moz ARIS GOLD 6