Energy Transition Market Growth
GE Vernova lean operating system
APPLYING SAFETY, QUALITY, DELIVERY & COST EVERY DAY
45%
9 TO 5
GE GE VERNOVA
reduction in injury and illness rate across GE Vernova
since 2018
reduction of Onshore Wind nacelle variants from
2021 to 2024
SAFETY
Drive culture of addressing
potential severe events
QUALITY
Eliminating defects & waste
starting in the factory floor
DELIVERY
Reducing cycle times and
improving on-time delivery
~3 MILES
Focus on structural cost-out
COST
& business simplification
~$1.8B
reduction in distance travelled in the factory
for Gas Power's blade manufacturing process
reduction in fixed cost from major initiatives since
2018 across Gas Power, Onshore Wind and within
Electrification
Driving culture of continuous improvement while investing in long-term breakthroughs
© 2024 GE Vernova and/or its affiliates. All rights reserved.
20
20View entire presentation