INFRASTRUCTURE FOR THE FUTURE SEMI REGULATED REVENUES (100% BASIS) Victoria Power Networks ($m) Public Lighting New Connections Special Reader Activities Service Truck Activities Recoverable Works Specification and Design Other TOTAL SA Power Networks ($m) Public Lighting Metering Services Pole/Duct Rental Other Negotiated Services (1) TOTAL (2) HY 2020 HY 2019 Variance 5.9 6.1 (0.1) 7.7 7.1 0.6 2.3 2.4 (0.1) 3.1 2.9 0.2 0.6 0.7 (0.0) 6.0 6.0 (0.0) 4.5 4.0 0.5 30.1 29.1 0.9 HY 2020 HY 2019 Variance 8.2 11.9 (3.7) 7.6 7.8 (0.2) 2.5 2.2 0.3 22.3 24.8 (2.5) 40.6 46.7 (6.1) (1) Includes Asset Relocation and Embedded Generation (2) Does not include Alternative Control Services (ACS) revenue, which is reported as part of DUOS revenue Spark Infrastructure I Investor Presentation | August 2020 49