Simberi PNG - Pre-feasibility Study
> Pre-feasibility Study (PFS) due April 2016
> Progress report on the PFS proposes:
> Sulphide Project utilises the existing
infrastructure on Simberi Island, including the
airport, power station, village and wharf
> the existing semi-autogenous grinding (SAG)
mill and ball mill would be utilised in new
plant flowsheet and maintain the ability to
process both oxide and sulphide ores
processing sulphide ore to produce saleable
concentrate is the preferred option, avoids
need for downstream processing on the
Island
> Some parts of the oxide reserve are contained
within the Sulphide Project pit shell and
would continue to be processed to generate
gold doré
23 Asia Investor Relations Roadshow / March 2016
Ship unloading at Pigiput Bay port.