Investor Presentaiton slide image

Investor Presentaiton

FURTHER OPERATION OF EPC WOULD DEMAND CONSIDERABLE INVESTMENTS MAINLY TO FULFIL ENVIRONMENTAL REQUIREMENTS BREF/BAT fulfillment Operation until 2024 So NOX PM Hg Overhaul (renewal) Operational and technical measures Increasing the dosage of additives Possibly getting an exemption Overhaul of electro separator DeHg basic capture measures Maintenance (overhaul B3 only) • • until 2029** Overhaul of desulphurisation Exception or technical measures need to be added Overhaul of electro separator, desulphurization modification DeHg greater capture range Major renewal required (of all units) Estimated outlays for investment, operation and maintenance of the plant CAPEX + OPEX (normal maintenance and specific actions) [bn CZK] Operating period: Calculated: On supplied electricity 2-5 2019-2023 9-12 2019-2030 3-8 EUR/MWh 6-9 EUR/MWh 100-240 ths. EUR/MW 430 580 ths. EUR/MW = The revision of BREF / BAT with effect from 2029 is addressed by expected exemption until 2030 On installed capacity Operation beyond 2030 is not considered due to the limited residual life of the source and its ability to meet emission limits and other future conditions following the subsequent revision of BREF with effect from 2029. 22 Note: ** Extended operations until 2030 under the assumption of obtaining an exemption CEZ GROUP
View entire presentation