FURTHER OPERATION OF EPC WOULD DEMAND
CONSIDERABLE INVESTMENTS MAINLY TO FULFIL
ENVIRONMENTAL REQUIREMENTS
BREF/BAT fulfillment
Operation
until 2024
So
NOX
PM
Hg
Overhaul
(renewal)
Operational
and technical
measures
Increasing the
dosage of
additives
Possibly
getting an
exemption
Overhaul of
electro
separator
DeHg basic
capture
measures
Maintenance
(overhaul B3
only)
•
•
until 2029**
Overhaul of
desulphurisation
Exception or
technical measures
need to be added
Overhaul of electro
separator,
desulphurization
modification
DeHg greater
capture range
Major renewal
required
(of all units)
Estimated outlays for investment, operation and
maintenance of the plant
CAPEX + OPEX (normal maintenance and specific actions) [bn CZK]
Operating period:
Calculated:
On supplied electricity
2-5
2019-2023
9-12
2019-2030
3-8 EUR/MWh
6-9 EUR/MWh
100-240 ths.
EUR/MW
430 580 ths.
EUR/MW
=
The revision of BREF / BAT with
effect from 2029 is addressed by
expected exemption until 2030
On installed capacity
Operation beyond 2030 is not considered due to the limited residual life of the source and its ability to meet
emission limits and other future conditions following the subsequent revision of BREF with effect from 2029.
22
Note: ** Extended operations until 2030 under the assumption of obtaining an exemption
CEZ GROUPView entire presentation