2021 Work Programs slide image

2021 Work Programs

Ohra-Takamine: Ohra Mine cross-section with Japan Gold and MMAJ drilling* 500m B 1524400mN 0.35m @ 1.7 g/t Au & 5 g/t Ag from 231.15m Vein 1 outctop (3m wide) 400m 300m New drill target zone 200m 100m 584.0m Ohra Mine 649000mB 3524200mN Vein 2 outcrop (4.6m wide) Vein 3 outcrop (2.3m wide) OTDD19-001 550 400 100 150 200 250 450 455.0m -150 649000mE OTDD20-002 50 50 100 59MAHT-2 3524000mN JAPAN GOLD CORP. B' 500m 400m 300m LEGEND Elevated gold > 0.1 g/t Japan Gold drill hole MMAJ drill hole Ohra mine workings Quartz vein / vein zone Sheeted/stockwork vein zone Alteration Kaolinite-smectite Smectite Illite-smectite Fault/fault breccia zone Andesite dyke Andesite volcanics *Within the mine alteration corridor, 8 drill holes were completed as part of government funded geological survey work by the Metal Mining Agency of Japan (MMAJ) during the 1980's. TSXV: JG | OTCQB: JGLDF 0 50 100 150 meters 39
View entire presentation