Investor Presentaiton
Bemolanga Mining Conclusions
8042000
COCOHOR
500000
502000
504000
506000
508000
510000
512000
514000
516000
H
AUTE
106
Height of bitumen
At 3% cut-off
10-12 m
8-10
17 June 2011
6-8
4-6
2-4
0-2
NG
N
BA
003
ht
WHO
NINA
SAPLE
9121
1129
18129
WAS
N
N127
NT2
+
121
1428
NGO4
WOMA
RAZON
ком
CAMP
MALAY
GZON
YEAR
5243
5118
1044
3541
North and South bitumen mine areas
Investor Update
MADAGASCAR OIL
The JV drilled and cored 160 wells in 2009 and
2010 to define and test the PIIP and recovery.
-
-
-
-
-
-
Completed tests on bitumen content.
Tested extraction using hot water process.
Estimated required facility and cost.
Observations from JV mine analysis:
The bitumen volume is greater than 1 billion
barrels.
Weight percent of bitumen in the ore is half
that of Canadian averages at 5.54%.
Conventional Clark hot water extraction,
recovery above average bitumen of 75%.
Madagascar Oil and Total E&P agree that:
The low ore grade makes an economic
project scenario unlikely in the near future.
Commitment to a pilot extraction plant is
not a prudent investment at this time.
17View entire presentation