NuScale Power Investor Presentation
Setting SMR Standards for Design Safety and Innovation
Unlimited Coping Period 1
for Reactors
Coping Period Comparison:
Extreme Station Blackout & AC/DC
Power Loss
Generation II Reactors:
4-8 Hours with Significant
Operator Actions Required
Generation III & III+
Reactors: Up to 72
Hours with No Operator
Actions
ONLY SMR WITH
UNLIMITED
NO OPERATOR ACTIONS
OR EXTERNAL SUPPORT
NRC-Approved Site Boundary
Emergency Planning Zone (EPZ)
Significantly smaller
radius than traditional
nuclear
"At-the-fence"
proximity to
end-users
Increased siting
flexibility and
decreased operating
costs
Unparalleled Capability
and Performance
"Black-Start” and “Island Mode"
No grid power or connection
required first for a nuclear
power plant
First Responder Power
Can inject power back into the
system to support grid
restoration
Highly Reliable, 24/7 Carbon-free
Clean energy to mission-critical
with reliability over the 60-year
plant lifetime
Proven Safety Features Drive Credibility with Regulators and Customers
1 Coping period is defined as time available from loss of all AC power to the safety bus until onset of core damage if no counter measures
NuScale Nonproprietary | Copyright © 2023 NuScale Power, LLC.
7
NUSCALE
Power for all humankindView entire presentation