Waterloo Brewing Investment Highlights
NA Beer Buildout
Waterloo has begun construction on non-alcoholic beer equipment that will serve as the basis for CIB
production and will produce beverages alongside Waterloo's current brewing systems
Facility
Waterloo's non-alcoholic beer processing system enables the
company to use standardized beer as the input
The NA beer system will extract alcohol from the beer,
creating a 0% ABV beverage
Following the de-alcoholization process, the remaining
product can further be processed through filtration and
blending with flavour components to deliver a finished product
with the same chacteristics as standardized beer
The finished NA beverage can be filled into finished
containers using the same bottle, can and kegging equipment
The NA beer equipment will exist in an expanded area within
the Kitchener facility and will produce concurrently with its
current beer systems, creating no disruption to Waterloo's
existing business
Preparation for CIBS
December 2018: Begin construction
May 2019: Equipment delivery on site
July 2019: Install and commission equipment, commence
trials
August 2019: Conduct trials and sensory evaluations
September 2019:
A
Finalize NA beer product
De-alcohol system
Alfadose system
25
CIB Production
January 2019 to April 2019: Secure liquid-infused cannabis
from third party suppliers
May to September 2019: Develop brand marketing plan
July to September 2019: Conduct product development
process
October 2019: Begin CIB production and ship CIB finished
goods from Waterloo facility to customers
WATERLOO0
-BREWING-View entire presentation