Corporate Presentation 6M2015 Results slide image

Corporate Presentation 6M2015 Results

Distribution Infrastructures Development EPROD Railway (Upgraded) Capacity : up to 22.7 M tpa TE - Kertapati : 160.9 km - TE - Tarahan : 409.5 Km Expect. COD : 2015 Railway Project (New) - BATR Capacity - Distance : 25.0 M tpa : 280 Km Expect. COD: 2019 Tanjung Enim Mine with the installed production capacity of 25 Mtpa TANJUNG ENIM MINE Muara Enim Lahat Prabumulih Tarahan Port Expansion - Capacity: From 13.0 to 25.0 Mtpa - Expect. COD: April 2015 Tarahan Port become the largest Coal Terminal on Sumatera since it can accomodate "Capesize" bulkcarrier vessels of upto 210,000DWT. It is fully owned and operated by PTBA Baturaja (The proposed railway) Double Tracks Bukit Asam Single Track with Crossing Sections Kertapati Palembang Barging Port (The proposed Tarahan Coal Terminal port) 13
View entire presentation