Corporate Presentation 6M2015 Results
Distribution Infrastructures Development
EPROD
Railway (Upgraded)
Capacity
: up to 22.7 M tpa
TE - Kertapati : 160.9 km
- TE - Tarahan
: 409.5 Km
Expect. COD
: 2015
Railway Project (New) - BATR
Capacity
- Distance
: 25.0 M tpa
: 280 Km
Expect. COD: 2019
Tanjung Enim Mine with
the installed production
capacity of 25 Mtpa
TANJUNG ENIM MINE
Muara Enim
Lahat
Prabumulih
Tarahan Port Expansion
- Capacity: From 13.0 to 25.0 Mtpa
- Expect. COD: April 2015
Tarahan Port become the largest
Coal Terminal on Sumatera since it can
accomodate "Capesize" bulkcarrier
vessels of upto 210,000DWT. It is fully
owned and operated by PTBA
Baturaja
(The proposed
railway)
Double Tracks
Bukit Asam
Single Track with Crossing Sections
Kertapati Palembang
Barging Port
(The proposed
Tarahan
Coal Terminal
port)