Evolution Mining FY24 Guidance Update

MT RAWDON PUMPED HYDRO - A STRATEGIC ASSET Up to 2GW Up to 10 hours of continuous 20,000MWh storage Showcase for repurposing generation - Significant Size: 2GW power for 10 hours a day – can power 2 million homes during peak periods Ownership: 50/50 JV with ICA Partners, an Australian leader in renewables advisory Fully Permitted Mine Site: 100% land ownership already secured¹ – strong community support Favourable Location: only 22km from main transmission lines to Brisbane and Gladstone Enviable topography: 550 metre head height² – key economic driver - ESG benchmark: blueprint for repurposing end of life mine site Well Advanced: can be operational by 2030 Proposed upper reservoir Underground water pipeline Rehabilitation Dam walls 550m head Proposed tunnel access 1. Rights to land for upper reservoir 2. Borumba: 330m, Kidston: 218m, Snowy 2: 700m, Big T: 260m, Bowen & Pioneer Burdekin: N/A Lowest risk and cost of capacity pumped hydro project in Australia Proposed lower reservoir (Mt Rawdon pit) 39
View entire presentation