Investor Presentaiton
•
•
•
•
Phase 3 Exploration Program
9 000 meter Resource and extensional drilling between
Chatsunda Pit 2 and 3.
JORC-compliant Maiden Resource Estimate shall be completed
at an Indicated confidence level by the 3rd quarter of 2023, as
well as an early-stage Scoping Study / Pre-feasibility Study
thereafter.
Geochemical Sampling Program on other Prospect Areas (500
m x 500 m grids).
Auger Drilling, Trenching and Channel Sampling at best
Prospect Areas as identified though Geochemical Sampling
Program.
Additionally, our strategy involves drilling at a later stage
funded by a small-scale mining initiative at several targeted
locations, including:
➤ Between Messengereze and Chatsunda Pit 2,
➤ The major anomaly area at Copper Hill,
At promising structural intersection points adjacent to the
main prospect areas.
Our ultimate aim is to delineate a multi-million-ounce resource.
AFRICAN LION
GOLD plc
27View entire presentation