Investor Presentaiton
TB Copper Project
Latest Drill Results
UHGZ Drilling Results
MERDEKA
COPPER GOLD
Comments
The most recent 8 holes of
the current infill drilling
program have all returned
intercepts in line with or
exceeding expectations
3 of 8 holes finished in
mineralization
Hole ID
From
(metres) (metres)
Το
Interval
Cu %
Au g/t
(metres)
UHGZ-20-011
576
784.8
208.8
0.5
0.5
298
779.6
481.6
0.7
0.7
UHGZ-20-012/012W
560
638
78
1.0
1.0
522
718
196
0.5
0.6
UHGZ-20-013
596
640
44
1.0
1.1
0
332
332
0.3
0.3
UHGZ-20-014
626
828
202
0.5
0.1
722
756
34
1.1
0.2
0
434
434
0.8
0.4
UHGZ-20-015
178
360
182
1.1
0.6
376
662
286
0.6
0.7
UHGZ-20-016
514
564
50
0.9
1.2
2
810.3
808.3
0.6
0.5
UHGZ-20-017
378
430
52
1.2
0.9
532
600
68
1.3
0.5
0
194
194
1.2
1.1
UHGZ-20-018
278
484
206
0.8
1.0
354
470
116
1.0
1.0
25
25View entire presentation