Investor Presentaiton slide image

Investor Presentaiton

TB Copper Project Latest Drill Results UHGZ Drilling Results MERDEKA COPPER GOLD Comments The most recent 8 holes of the current infill drilling program have all returned intercepts in line with or exceeding expectations 3 of 8 holes finished in mineralization Hole ID From (metres) (metres) Το Interval Cu % Au g/t (metres) UHGZ-20-011 576 784.8 208.8 0.5 0.5 298 779.6 481.6 0.7 0.7 UHGZ-20-012/012W 560 638 78 1.0 1.0 522 718 196 0.5 0.6 UHGZ-20-013 596 640 44 1.0 1.1 0 332 332 0.3 0.3 UHGZ-20-014 626 828 202 0.5 0.1 722 756 34 1.1 0.2 0 434 434 0.8 0.4 UHGZ-20-015 178 360 182 1.1 0.6 376 662 286 0.6 0.7 UHGZ-20-016 514 564 50 0.9 1.2 2 810.3 808.3 0.6 0.5 UHGZ-20-017 378 430 52 1.2 0.9 532 600 68 1.3 0.5 0 194 194 1.2 1.1 UHGZ-20-018 278 484 206 0.8 1.0 354 470 116 1.0 1.0 25 25
View entire presentation