Emerging Gold Producer with Massive Exploration Upside slide image

Emerging Gold Producer with Massive Exploration Upside

TSXV:PGDC Lomada de Leiva Project • Part of the 59,200 ha La Paloma property (95% ownership) located in Santa Cruz Province Recently announced plans to restart mining operations Commenced commercial production in 2013. Mine was closed in May 2016, while production from heap leach has continued - - Total of 1.9M tonnes of ore grading 1.97 g/t Au (121,100 oz Au) has - - been placed on the heap leach, with ~98, 100 oz recovered to date During peak production, Lomada produced -3,900 oz Au per month Company continues to recover ~300 oz Au per month from leaching Over the first 6 months of 2021, Lomada produced 1,117 oz Au at a cash cost of US$2,283/oz Au ⚫ Low sulphidation, epithermal gold system hosted in a NNE- striking, steeply ESE-dipping structure (Main Breccia) • Previous mining occurred from a portion of the Main Breccia over a 600 m strike, up to 20 m width and more than 150 m in depth Received a preliminary Environmental Permit for mining and leaching operations on October 8, 2020 • Mining operations restarted in December 2020. Announced restart of this high-grade, open-pit heap leach gold operation Image of the Lomada de Leiva mineral system, existing mine limits and potential new mineralization 2380900X 4797800 23810 4797900 23811 479800 + 23812 10 2381 100 m 100 m 47982x 4798300 Y N 238060 Current Lomada Pits Limits 4798400 Y Extension of the Main Breccia-hosted Mineralization Proposed Pit Lay-back & PATAGONIA GOLD patagoniagold.com 10
View entire presentation