Emerging Gold Producer with Massive Exploration Upside
TSXV:PGDC
Lomada de Leiva Project
•
Part of the 59,200 ha La Paloma property (95% ownership)
located in Santa Cruz Province
Recently announced plans to restart mining operations
Commenced commercial production in 2013. Mine was closed in
May 2016, while production from heap leach has continued
-
- Total of 1.9M tonnes of ore grading 1.97 g/t Au (121,100 oz Au) has
-
-
been placed on the heap leach, with ~98, 100 oz recovered to date
During peak production, Lomada produced -3,900 oz Au per month
Company continues to recover ~300 oz Au per month from leaching
Over the first 6 months of 2021, Lomada produced 1,117 oz Au at a
cash cost of US$2,283/oz Au
⚫ Low sulphidation, epithermal gold system hosted in a NNE-
striking, steeply ESE-dipping structure (Main Breccia)
•
Previous mining occurred from a portion of the Main Breccia over a
600 m strike, up to 20 m width and more than 150 m in depth
Received a preliminary Environmental Permit for mining and
leaching operations on October 8, 2020
•
Mining operations restarted in December 2020.
Announced restart of this high-grade, open-pit heap
leach gold operation
Image of the Lomada de Leiva mineral system, existing
mine limits and potential new mineralization
2380900X
4797800
23810
4797900
23811
479800
+
23812
10
2381
100 m
100 m
47982x
4798300 Y
N
238060
Current Lomada
Pits Limits
4798400 Y
Extension of the Main Breccia-hosted
Mineralization
Proposed Pit Lay-back
&
PATAGONIA
GOLD
patagoniagold.com
10View entire presentation