Investor Presentaiton slide image

Investor Presentaiton

US-ABWR SBO Response Capability Without CTG Sequence of Events 1250 Firewater Addition Starts Time 0.0 - - Event MSIV Closure 4.2 s Reactor Scrammed 52.0 s RCIC Injection, Suction from CST 1.3 h RCIC Suction Switched to Suppression Pool 4.4 h RCIC Suction Switched to CST 8.0 h RCIC Failure 9.0 h 9.8 h Manual ADS 9.9 h 32.3 h Suppression Pool began to overflow to Lower Drywell Collapsed Water Level Falls below Top of Active Fuel Firewater Addition System Injection Begins Rupture Disk Opened Core temperature peaks before fuel damage occurs due to ACIWA water injection Containment pressure is maintained below allowable limit by COPS - No Core Damage Pressure (MPa) UO2 Temperature (K) 1.0 0.8 0.6 0.4 0.2 1000 750 500 250 RCIC Fails 1500 1250 1000 750 500 Maximum 250 0 0 10 20 30 40 50 60 70 Time (h) RCIC Fails UO2 Temperature Rupture Disk Opens Upper Drywell 0.0 - No Loss of Containment Integrity 0 10 20 30 40 50 60 70 Time (h) TOSHIBA Copyright © 2012 Toshiba Corporation. All rights reserved. Leading Innovation >>> 29 Drywell Pressure 0 UO₂ Temperature (°F)
View entire presentation