Murphy West Uranium Project Overview slide image

Murphy West Uranium Project Overview

Kennedy Project: Extensive lonic Clay Rare Earth Elements (REE) in Surface Clays Step-out drilling confirms regional scale REE mineralisation from surface with significant results from drilling including: DevEx Granted DevEx Applications Drilling - 2m @ 1,537ppm TREO from surface (KRAB013) - - - 2m @ 1,734ppm TREO from surface (KRAB016) 4m @ 1,017ppm TREO from surface (KRAB022) 2m @ 1,514ppm TREO from surface (KRAB027) 3m @ 1,008ppm TREO from surface (KRAB031) 2m @ 1,507ppm TREO from surface (KRAB032) 2m @ 1,650ppm TREO from surface (KRAB035) 1.5m @ 1,138ppm TREO from 0.5m (KAC062) 1.5m @1,508ppm TREO from 0.5m (KAC066) Drilling demonstrates higher grade magnet rare earth elements such as Terbium (Tb) and Dysprosium (Dy) in numerous holes 500-1000 Hole Number 2023 Aircore Drilling Maximum TREO (ppm) Assay in Top 4m. • >1000 . 24 42 40 25 41 39 26 150-500 19 27 38 Geology 14 28 Tertiary Clays (Target Regolith) 70 6 Quaternary Drainage plus Clays 5 29 Basement Stratigraphy 30 Granite plus Intrusives 31 11° EPM28009 36 10 35 34 8 9 33 32 DRILLING PLANNED DRILLING PLANNED DRILLING PLANNED 5km 305 000mE Kennedy Project QUEENSLAND 52 53 51 054 55 50 56 57 58 59 60 61 62 63 49 48 48. 47 46 45 67 64 65 44 66 43 8 035 000mN 8 035 000mN 14
View entire presentation