Murphy West Uranium Project Overview
Kennedy Project: Extensive lonic Clay Rare Earth Elements (REE) in Surface Clays
Step-out drilling confirms regional scale REE mineralisation from
surface with significant results from drilling including:
DevEx Granted
DevEx Applications
Drilling
-
2m @ 1,537ppm TREO from surface (KRAB013)
-
-
-
2m @ 1,734ppm TREO from surface (KRAB016)
4m @ 1,017ppm TREO from surface (KRAB022)
2m @ 1,514ppm TREO from surface (KRAB027)
3m @ 1,008ppm TREO from surface (KRAB031)
2m @ 1,507ppm TREO from surface (KRAB032)
2m @ 1,650ppm TREO from surface (KRAB035)
1.5m @ 1,138ppm TREO from 0.5m (KAC062)
1.5m @1,508ppm TREO from 0.5m (KAC066)
Drilling demonstrates higher grade magnet rare earth elements
such as Terbium (Tb) and Dysprosium (Dy) in numerous holes
500-1000
Hole Number
2023 Aircore Drilling
Maximum TREO (ppm) Assay in Top 4m.
• >1000
.
24
42
40
25
41
39
26
150-500
19
27
38
Geology
14
28
Tertiary Clays (Target Regolith)
70
6
Quaternary Drainage plus Clays
5
29
Basement Stratigraphy
30
Granite plus Intrusives
31
11°
EPM28009
36 10 35 34
8
9 33 32
DRILLING
PLANNED
DRILLING
PLANNED
DRILLING
PLANNED
5km
305 000mE
Kennedy
Project
QUEENSLAND
52
53
51
054
55
50
56
57
58
59
60
61
62
63
49
48
48.
47
46
45
67
64
65
44
66
43
8 035 000mN
8 035 000mN
14View entire presentation