Investor Presentaiton
SHIP POWER
Oil and NGL Production Curve (kbpd)
2,022
2011
Pacific Mistral
DRU - 50 Drilling Rigs: 2012 - 2020
(PAD Iracema North) Oil Production, Brazil: 2,022 - 4,200 kbpd
Schahin Amazonia
(Iguape Drilling)
Schahin Cerrado
(PAD Júpiter
Northeast)
Ocean Rig Mykonos
(ADR LL Central)
Etesco Takatsugu J
(Franco SW)
P-59
(Peroá)
Ocean Rig
Corcovado
(Iracema High)
Deepsea Metro II
(Farfan Bloco BM
SEAL-11)
Schaihn Sertão
(Roncador)
Sevan Brasil
(Sagitário)
Odn Delba III
(PAD Trachemys
Quelônio)
P-60**
(Block BM-C-27)
Am aralina Star
(CO South of Tupi
Laguna Star
Odn I - Norbe X (CO PAD Franco)
YCO PAD Francol
Odn II - Norbe XI
(CO Florim)
Odn Tay IV
(RF of Albacora)
Mangaratiba
(Florim)
Itaunas
(Exploration)
Interlagos
(Exploration)
Frade
Marambaia
(Júpiter)
Leblon
(lara
Arpoador
(Lula North)
Camburi
(Franco East) Surround)
(South of
Portogalo
Copacabana Guará)
Botinas
(lara
(Florim)
(Franco NE)
Pituba
Surround)
Comandatuba
Urca
(lara NW)
Itapema
(Exploration)
(Franco East)
Ipanema
Salinas
(Exploration)
Guarapari
(Júpiter)
(lara NW)
Siri
Sahy
(Exploration)
Boipeba
(NE of Tupi)
Bracuhy
(Exploration)
Ondina
(Carcará)
Leme
(Franco East)
(Exploration)
TBN 4*
TBN 5
4,200
TBN3*
Cassino
(lara Horst)
(Lula North)
(Carcará 1).
TBN1*
Itaoca
(lara NW)
Curumim
(Exploration)
Grumari
TBN2
Drilling Ships (38)
Semisubmersible (10)
2,500
Drilling Rigs
Construction
25 up to 2016
50 up to 2020
Auto raising (2)
2012
2013
2014
2015
* Under negotiation, to be confirmed in the contracts signature; ** P-59 and P60 drilling rigs were constructed in Brazil
Petrobras' CEO presentation 20th September 2012
© Wärtsilä
2016
2017
2018
2019
2020
WÄRTSILÄView entire presentation